Hypervisor Maintenance

Created:
11 October 2019 09:20
Start:
25 October 2019 18:00
End:
25 October 2019 22:00
Affected Services:
cp1.intelli.host
Severity:
Hardware Maintenace that will result in downtime
Open

Details:

We need to perform hardware maintenance on the cloud hypervisor that hosts our cp1.intelli.host server. The hypervisor will be shutdown which will result in some downtime during our hardware maintenance and subsequental updates. We do not anticipate any extended downtime.

Updates and Notes:

No Updates or Notes added for this notice.

Imunify360 Setup and Reboot

Created:
27 August 2019 11:10
Start:
1 September 2019 09:00
End:
1 September 2019 18:00
Affected Services:
All cPanel Servers
Severity:
Some downtime during server reboot
Closed

Details:

Our team will be installing Imunify360 on all of our hosting servers this coming weekend. Imunify360 is an enterprise grade security suite offering a vast amount of proactive security tools including firewall, intrusion protection, malware scanning and more. Imunify360 will replace all other security software we currently have installed on our hosting servers.

The installation and configuration will require a restart of all of our cPanel servers. During the restart, all services will be down briefly and should be up and running again within a hour after the restart. We dont' anticipate any extended downtime.

Updates and Notes:

No Updates or Notes added for this notice.

Power & UPS Failure Testing

Created:
18 June 2019 17:06
Start:
22 June 2019 10:00
End:
22 June 2019 11:00
Affected Services:
All services hosted at our Johannesburg Datacentre
Severity:
Services will be down briefly while our networking equipment restarts
Closed

Details:

Our Johannesburg Datacentre will be performing Power and UPS testing this coming Saturday evening between 12:00 - 06:00 - During testing, they will disable power breakers at the datacentre to simulate a power failure. 

We will be moving our networking switches power input to the secondary breakers to ensure no downtime during the Datacentre testing which will result in a couple of minutes downtime while the networking equipment restarts.

Updates and Notes:

No Updates or Notes added for this notice.

rcp1.intelli.host migration to new hardware

Created:
10 June 2019 08:53
Start:
16 June 2019 15:00
End:
16 June 2019 21:00
Affected Services:
rcp1.intelli.host
Severity:
Services will be down during this maintenance window
Closed

Details:

Please note that the below maintenance only affects accounts setup on rcp1.intelli.host

We have completed the neccesary upgrades to the host that will house our rcp1.intelli.host server and are ready to move rcp1.intelli.host to it's final home. Unfortunately, due to the size of our cPanel based servers, we are unable to do a live migration and for your safety, we need to physically shutdown the cPanel server and make a full copy of the server its cloud host. The copy of the entire virtual server (rcp1.intelli.host) is estimated to take around 5 hours. Once the copy is done, rcp1.intelli.host will immediately be booted on the new hardware. In the event of any issues related to the copy of the server, we'll start rcp1.intelli.host on the current hardware and reschedule maintenance.

Updates and Notes:

No Updates or Notes added for this notice.

cPanel Server Restart to allow for software updates

Created:
3 June 2019 08:44
Start:
8 June 2019 14:00
End:
8 June 2019 15:00
Affected Services:
cp1.intelli.host & rcp2.intelli.host
Severity:
Services will be down briefly with degraded performances to be resolved within a hour
Closed

Details:

We will be restarting the above 2 servers which requires software updates. We dont anticipate any technical difficulties and services will be back up within minutes but you may experience some degraded performances for about a hour whilst services start up.

Updates and Notes:

No Updates or Notes added for this notice.

rcp1.intelli.host cloud host update

Created:
3 June 2019 08:13
Start:
8 June 2019 08:00
End:
8 June 2019 14:00
Affected Services:
rcp1.intelli.host
Severity:
Services will be down during this maintenance window
Closed

Details:

Please note that the below maintenance only affects accounts setup on rcp1.intelli.host

As part of our recent datacentre upgrades, we need to perform server hardware upgrades to each cloud host we have at our datacentre and upgrade Citrix Hypervisor on each host. To avoid any possibility of issues related to these upgrades, we need to move all of the virtual machines we host on each cloud host to our failover network to safely perform upgrades to the servers. Unfortunately, due to the size of our cPanel based servers, we are unable to do a live migration and for your safety, we need to physically shutdown the cPanel server and make a full copy of the server to our failover network and boot it up there again after the full copy has been completed. The copy of the entire virtual server (rcp1.intelli.host) is estimated to take around 6 hours. Once the copy is done, we'll immediately boot up the server again in the failover environment and all services will be back online.

Once the upgrades to the cloud host has been completed, we'll perform stress testing on the host for a week and upon successful results, schedule maintenance again to move the cPanel server back to its original cloud host. In all events we'll schedule downtime outside of business hours to ensure you're not affected by the downtime. Although you may not be able to send any emails out during the copy process, all clients making use of SpamExperts will have any mails sent during the window period delivered once the server comes back online.

Updates and Notes:

No Updates or Notes added for this notice.

cp2.intelli.host move to designated host

Created:
3 June 2019 08:10
Start:
7 June 2019 18:00
End:
7 June 2019 22:00
Affected Services:
cp2.intelli.host hosting & emails
Severity:
Services will be down during this maintenance window
Closed

Details:

We have completed the neccesary upgrades to the host that will house our cp2.intelli.host server and are ready to move cp2.intelli.host to it's final home. Unfortunately, due to the size of our cPanel based servers, we are unable to do a live migration and for your safety, we need to physically shutdown the cPanel server and make a full copy of the server its cloud host. The copy of the entire virtual server (cp2.intelli.host) is estimated to take around 4 hours. Once the copy is done, cp2.intelli.host will immediately be booted on the new hardware. In the event of any issues related to the copy of the server, we'll start cp2.intelli.host on the current hardware and reschedule maintenance.

Updates and Notes:

No Updates or Notes added for this notice.

cp2.intellihost Cloud Host Update

Created:
27 May 2019 10:16
Start:
1 June 2019 15:00
End:
1 June 2019 21:00
Affected Services:
cp2.intelli.host hosting & emails
Severity:
Services will be down during this maintenance window
Closed

Details:

Please note that the below maintenance only affects accounts setup on cp2.intelli.host

As part of our recent datacentre upgrades, we need to perform server hardware upgrades to each cloud host we have at our datacentre and upgrade Citrix Hypervisor on each host. To avoid any possibility of issues related to these upgrades, we need to move all of the virtual machines we host on each cloud host to our failover network to safely perform upgrades to the servers. Unfortunately, due to the size of our cPanel based servers, we are unable to do a live migration and for your safety, we need to physically shutdown the cPanel server and make a full copy of the server to our failover network and boot it up there again after the full copy has been completed. The copy of the entire virtual server (cp2.intelli.host) is estimated to take around 6 hours. Once the copy is done, we'll immediately boot up the server again in the failover environment and all services will be back online.

Once the upgrades to the cloud host has been completed, we'll perform stress testing on the host for a week and upon successful results, schedule maintenance again to move the cPanel server back to its original cloud host. In all events we'll schedule downtime outside of business hours to ensure you're not affected by the downtime. Although you may not be able to send any emails out during the copy process, all clients making use of SpamExperts will have any mails sent during the window period delivered once the server comes back online.

Updates and Notes:

No Updates or Notes added for this notice.

cp1.intelli.host migration to new hardware

Created:
7 April 2019 07:41
Start:
7 April 2019 12:00
End:
7 April 2019 16:00
Affected Services:
cp1.intelli.host hosting & Emails
Severity:
Services will be down during this maintenance window
Closed

Details:

Please note that the below maintenance only affects accounts setup on cp1.intelli.host

Following our maintenance with Citrix yesterday which was successful, we have completed the neccesary upgrades to the host that will house our cp1.intelli.host server and are ready to move cp1.intelli.host to it's final home. Unfortunately, due to the size of our cPanel based servers, we are unable to do a live migration and for your safety, we need to physically shutdown the cPanel server and make a full copy of the server its cloud host. The copy of the entire virtual server (cp1.intelli.host) is estimated to take around 4 hours. Once the copy is done, cp1.intelli.host will immediately be booted on the new hardware. In the event of any issues related to the copy of the server, we'll start cp1.intelli.host on the current hardware and reschedule maintenance.

Providing no issues occur, this will be the last scheduled maintenance for cp1.intelli.host and thank all clients for their patience with us during our hardware upgrades and migration process of the last couple of weeks. SpamExperts clients are reminded that all mails sent to your accounts will be captured by SpamExperts and released to your mailbox once the server is back online.

 

Updates and Notes:

No Updates or Notes added for this notice.

cp1.intelli.host Emergency Maintenance

Created:
3 April 2019 09:27
Start:
6 April 2019 17:00
End:
6 April 2019 23:30
Affected Services:
cp1.intelli.host hosting & Emails
Severity:
Services will be down during this maintenance window
Closed

Details:

This only affects accounts hosted on cp1.intelli.host

Following our recent copy of cp1.intelli.host to our failover network, Citrix has advised us to perform additional maintenance on the server to fix an issue with duplicate snapshot sizes created. Since a failed snapshot taking place sometime last year, the snapshot size exported is about double the size of the actual server. This leads to the snapshots taking twice the timeframe it should take which leads to unneccesary disk overhead and extended performance issues. During this maintenance window we need to shutdown the server again and make another copy of the VM to the same failover network. Citrix believes this will resolve the incorrectly linked broken snapshot. We expect a much shorter window period than last Friday and will again start the server once the full copy has taken place. 

We sincerely apologise for the inconvinience, we have taken each possible step to avoid further downtime but unfortunately Citrix listed this as the only option. We will be working with the Citrix team during this window period.

Updates and Notes:

No Updates or Notes added for this notice.

rcp2.intelli.host migration to new hardware

Created:
1 April 2019 07:44
Start:
6 April 2019 17:00
End:
6 April 2019 23:00
Affected Services:
rcp2.intelli.host cPanel server
Severity:
Services will be down during this maintenance window
Closed

Details:

Please note that the below maintenance only affects accounts setup on rcp2.intelli.host

We have completed the neccesary upgrades to the host that will house our rcp2.intelli.host server and are ready to move rcp2.intelli.host to it's final home. Unfortunately, due to the size of our cPanel based servers, we are unable to do a live migration and for your safety, we need to physically shutdown the cPanel server and make a full copy of the server its cloud host. The copy of the entire virtual server (rcp2.intelli.host) is estimated to take around 5 hours. Once the copy is done, rcp2.intelli.host will immediately be booted on the new hardware. In the event of any issues related to the copy of the server, we'll start rcp2.intelli.host on the current hardware and reschedule maintenance.

 

Updates and Notes:

No Updates or Notes added for this notice.

cp1.intelli.host Cloud Host Update

Created:
18 March 2019 10:43
Start:
29 March 2019 18:00
End:
30 March 2019 06:00
Affected Services:
cp1.intelli.host (cPanel) hosting & Emails
Severity:
Services will be down during this maintenance window
Closed

Details:

Please note that the below maintenance only affects accounts setup on cp1.intelli.host

As part of our recent datacentre upgrades, we need to perform server hardware upgrades to each cloud host we have at our datacentre and upgrade Citrix Hypervisor on each host. To avoid any possibility of issues related to these upgrades, we need to move all of the virtual machines we host on each cloud host to our failover network to safely perform upgrades to the servers. Unfortunately, due to the size of our cPanel based servers, we are unable to do a live migration and for your safety, we need to physically shutdown the cPanel server and make a full copy of the server to our failover network and boot it up there again after the full copy has been completed. The copy of the entire virtual server (cp1.intelli.host) is estimated to take around 6 hours. Once the copy is done, we'll immediately boot up the server again in the failover environment and all services will be back online.

Once the upgrades to the cloud host has been completed, we'll perform stress testing on the host for a week and upon successful results, schedule maintenance again to move the cPanel server back to its original cloud host. In all events we'll schedule downtime outside of business hours to ensure you're not affected by the downtime. Although you may not be able to send any emails out during the copy process, all clients making use of SpamExperts will have any mails sent during the window period delivered once the server comes back online.

 

Updates and Notes:

No Updates or Notes added for this notice.

Redstor Backups Service to be migrated to new hardware at our Samrand Datacentre

Created:
25 February 2019 13:33
Start:
1 March 2019 08:00
End:
1 March 2019 17:00
Affected Services:
Redstor Backups
Severity:
Backups may not complete successfully during this window period
Closed

Details:

We're migrating all clients on rsss01.intelli.host Redstor Backups to new servers which will mean some downtime on the account services. We will be working with the Redstor team and although we do not foresee extended downtimes clients may during the course of the day not be able to complete their backups. This will however be resolved during the course of the day so backups should function without an issue by the end of this notice period.

Updates and Notes:

No Updates or Notes added for this notice.

Network Upgrades at our Samrand Datacentre

Created:
3 February 2019 11:58
Start:
16 February 2019 10:00
End:
16 February 2019 22:00
Affected Services:
All services hosted at our Samrand Datacentre
Severity:
Some inaccessibility or degraded performance during maintenance window
Closed

Details:

Please be aware that the maintenace originally scheduled for the 9th of February has been rescheduled for the 16th of February 2019.

We will be performing upgrades to our Samrand datacentre:

  • We will be moving our servers to a new server rack
  • We’re upgrading our network to a 10GB network which will greatly improve performance to all Intellihost services
  • We’re upgrading our Redstor backup servers
  • Installation of new hosts specifically for cPanel and VM based backups

During this move, our team will physically move our infrastructure to it’s new rack, which means that all servers will have some downtime during this move which will result in inaccessibility of services hosted with us. Although we’ve scheduled maintenance for the entire day on Saturday, downtime will be far less per server as we’ll keep all servers running in the old rack and only move 1 physical host server at a time.

Updates and Notes:

Please be aware that the maintenace originally scheduled for the 9th of February has been rescheduled for the 16th of February 2019.

Firewall Upgrades and Maintenance

Created:
8 November 2018 07:53
Start:
10 November 2018 15:00
End:
10 November 2018 16:00
Affected Services:
Resellers VPN
Severity:
Resellers VPN may be inactive during this period
Closed

Details:

We will be performing updates and general maintenance to our firewalls at the Samrand datacentre. Resellers may experience intermitted connectivity issues to our VPN.

Updates and Notes:

No Updates or Notes added for this notice.

ZACR System Down - Incorrect Domain Notifications

Created:
29 October 2018 09:29
Start:
28 October 2018 20:00
End:
29 October 2018 10:00
Affected Services:
Intellihost Domains Manager
Severity:
Incorrect Emails and Statuses applied to domains
Closed

Details:

The ZACR domains system went down at 20:00 last night which led to a large number of false positives during our domain sync status checks. This led to emails being sent that domains were terminated which was not the case. We have switched off the domain sync process whilst we investigate the issue and impliment a fix to ensure that even if the ZACR system is down, that our system will not attempt to further check for updates or terminations during this period.

Updates and Notes:

The ZACR system appears to be operational again and we have also implimented a fix to ensure that domain sync will rather skip and processing when it detects that the ZACR or EPP system is down. We are currently doing some last testing before we disable maintenance mode at 10:00.

We have also set back all domains that was affected to their original statuses.